SHENERGY
0435 042 690 Invite Us to Tender Request a Quote
Call Enquire Now

Marine

Marine Pile Remediation & Protection

Inspection, surface preparation, repair and Denso SeaShield protection of marine piles through the tidal and splash zones.

Concrete and steel piles supporting a pier over the sea

Pile Remediation & Protection

Marine Pile Remediation & Protection

Piles deteriorate fastest in the tidal and splash zones, where concrete spalls, reinforcement corrodes and steel loses section. SHENERGY assesses pile condition, repairs damaged sections where required, and installs protection systems that extend the life of the structure.

  • Condition inspection and recording of each pile
  • Surface preparation: removal of marine growth, high-pressure water cleaning and removal of loose or deteriorated material
  • Repair of damaged pile sections where required
  • Supply and installation of Denso SeaShield pile protection systems through the tidal and splash zones
  • Close-out records of the piles treated

Process

How Pile Remediation Works

01

Inspect

Record the condition of each pile, including spalling, cracking, corrosion and section loss.

02

Prepare

Remove marine growth and loose material with high-pressure water cleaning to expose a sound surface.

03

Repair

Repair damaged pile sections where required before protection is applied.

04

Protect

Install Denso SeaShield protection through the tidal and splash zones to seal the pile from seawater and oxygen.

Also see: Floating Pontoon Fabrication & Installation

Planning Marine or Waterfront Works?

Request a project review or invite SHENERGY to tender for your upcoming marine works.